Tag Archive for: Storage

N. Ireland: Fair Head Tidal Energy Park – North Antrim Coast

The project is adjacent to a second 100MW project being developed by Tidal Ventures Limited (TVL).

It is expected that the two projects together will export up to 200MW of renewable energy to the Northern Irish grid over the coming decade.

For more information please see the Fair Head Tidal Energy Park Website located HERE

Barlow Solar Park

DP Energy is developing two adjacent solar projects on brownfield sites in Southeast Calgary with a combined generation capacity of 64 MW.

Barlow Solar Park is the first of two adjacent solar projects being developed in Southeast Calgary on capped phosphogypsum stacks owned by Viterra Inc. Solar power generation offers a productive use of the sites that would otherwise have limited development potential. The projects will use a ballasted foundation system to ensure the integrity of the stacks are maintained and the clear, level surfaces of the sites offer an excellent installation platform.

Land Use Redesignation and Development Permit approvals were granted by the City of Calgary for the project in 2019 and the Alberta Utilities Commission (AUC) approval followed in 2020.

For more information please refer to the Barlow Solar Park Website located here.

 

Deerfoot Solar Park

DP Energy is developing two adjacent solar projects on brownfield sites in Southeast Calgary with a combined generation capacity of 64 MW.

Deerfoot Solar is the second of two adjacent solar projects being developed in Southeast Calgary on capped phosphogypsum stacks owned by Viterra Inc. Solar power generation offers a productive use of the sites that would otherwise have limited development potential. The projects will use a ballasted foundation system to ensure the integrity of the stacks are maintained and the clear, level surfaces of the sites offer an excellent installation platform.

Land Use Redesignation and Development Permit Applications were submitted to the City of Calgary on January 29, 2021.

For more information please refer to the Deerfoot Solar Park Website located here.

Saamis Solar Park

Uisce Tapa

DP Energy SPVs Halagonia Tidal Energy Limited (HTEL) and Rio Fundo Operations Canada Limited (RFOCL) control and manage the development of Berth E and Berth C at the Fundy Ocean Research Centre for Energy (FORCE) which is Canada’s leading research centre for in-stream tidal energy, located in the Bay of Fundy, Nova Scotia.

The combined project is called Uisce Tapa, which means fast water in Gaelic. DP is planning to develop both berths together as one project to take advantage of improved project economics, reduced exposure to technology risk, improved access to capital and shared operations. Both berths hold a sub-lease from FORCE for the deployment of 4.5 MW maximum export capacity. Both berths have been awarded a 15-year Feed in Tariff (FIT) under the Electricity Act and section 18(2) of the Regulations. The approved FIT rate is CDN$530/MWh and the power will be sold to Nova Scotia Power Inc (NSPI). The project will deploy 6 x 1.5 MW of AHH Mk1 devices – 9 MW.

The Andrtiz Hammerfest Hydro (AHH) MK1 is the proposed technology to be deployed on Berth E. The Mk1 has an 18.4 m diameter rotor and rated power of 1.5 MW. The turbine is a horizontal axis, 3 bladed, seabed mounted tidal turbine, which has been successfully deployed (3 machines) at MeyGen in Scotland. The Mk1 design represents the next generation in seabed mounted tidal turbine development for AHH incorporating a number of new features both to customise elements of the device for operation in the Bay of Fundy, but also to ready the device for commercial scale deployment.

Acoustic Doppler Current Profilers (ADCPs) were deployed in late July 2019 in order to collect information on the current flows at the specific project site.  The devices will be retrieved in August with analysis expected to complete by the end of September 2019.

Port Augusta Renewable Energy Park

The Port Augusta Renewable Energy Park is a unique hybrid renewable energy development integrating wind and solar PV technology.

DP Energy has partnered with Spanish renewable energy giant Iberdrola to build the Port Augusta Renewable Energy Park. With a capex of $500 million, the project will provide around 320 MW of power on land situated on the coastal plain south-east of Port Augusta, in South Australia.